Dock / Seawall Permit in Palm Beach County, Florida
Need a dock / seawall permit pulled in Palm Beach County? We match you with an experienced Florida permit professional who knows the Palm Beach County building department and handles the entire dock / seawall permit process.
Still requires a permit
Does Florida’s new $7,500 permit exemption apply to dock / seawall permits in Palm Beach County?
No. Dock and seawall work is structural and sits in a flood hazard area by definition, and HB 803 excludes both, so a permit is still required along with any environmental approvals.
HB 803 (Chapter 2026-63) took effect July 1, 2026 and applies statewide, including Palm Beach County. To qualify, all of the following must be true:
- The property is a single-family residential property
- The total value of the work is less than $7,500, based on a written proposal or estimate from a licensed contractor
- The property is not in a flood hazard area
- The work is not electrical, plumbing, mechanical, gas, or structural work
The exemption is not self-certifying. A homeowner or contractor submits an exemption request and the building official determines whether the work qualifies. Starting work on the assumption that it does can lead to a stop-work order and an unpermitted-work disclosure when you sell.
Not sure which side of the line your project falls on? Get a straight answer →
Getting a Dock / Seawall Permit in Palm Beach County
Palm Beach County Planning, Zoning and Building Department issues dock / seawall permits for Palm Beach County, and applications go through ePZB. For a dock / seawall permit, you'll typically need to submit an application with project details, plans or specifications, and applicable contractor licensing. The typical timeline for this type of permit is 4-8 weeks (includes environmental review).
This permit type requires a Notice of Commencement (NOC) to be filed with the Palm BeachCounty clerk's office before work begins. Your permit pro handles this as part of the process.
Who issues this permit in Palm Beach County
Palm Beach County Planning, Zoning and Building Department
- Phone
- (561) 233-5100
- Permit counter
- 2300 N. Jog Road, West Palm Beach, FL 33411
- Hours
- Monday–Friday, 8:00 a.m.–5:00 p.m. (last sign-in 4:30 p.m.)
- Apply online
- ePZB
Verified against Palm Beach County's own website on . Counties change hours, offices and portals, so confirm before you drive over.
Quick Facts
Timeline
4-8 weeks (includes environmental review)
NOC Required
Yes
Watch Out For These Palm Beach County Rejections
These are the most common reasons a dock / seawall permit application gets rejected. An experienced permit pro catches these before they cost you time.
- ×Missing environmental permits (DEP/Army Corps)
- ×Setback from property line
- ×Submerged land lease issues
Dock / Seawall Permit questions, answered for Palm Beach County
Does Florida's new $7,500 permit exemption mean I can skip a dock / seawall permit in Palm Beach County?
No. Dock and seawall work is structural and sits in a flood hazard area by definition, and HB 803 excludes both, so a permit is still required along with any environmental approvals. HB 803 (Chapter 2026-63) took effect July 1, 2026 and applies statewide, including Palm Beach County. Where it does apply, it is not automatic: the building official reviews an exemption request and decides.
Who issues a dock / seawall permit in Palm Beach County, Florida?
Palm Beach County Planning, Zoning and Building Department issues dock / seawall permits for Palm Beach County. You can reach the office at (561) 233-5100. Applications are submitted online through ePZB. The permit counter is at 2300 N. Jog Road, West Palm Beach, FL 33411. Counter hours are Monday–Friday, 8:00 a.m.–5:00 p.m. (last sign-in 4:30 p.m.).
How long does a dock / seawall permit take in Palm Beach County?
Dock / Seawall Permit approval in Palm Beach County typically takes 4-8 weeks (includes environmental review). That clock starts when the application is accepted as complete, not when it is first submitted, which is why an application that comes back for corrections can add a week or more to the total.
How much does a dock / seawall permit cost in Palm Beach County?
Dock / Seawall Permit fees in Palm Beach County generally fall in the $300-1,000+ range. Florida counties set their own fee schedules and most calculate them from the declared job valuation, so the final figure depends on the size of your project. Expect separate charges for plan review and for each inspection.
Do I need a Notice of Commencement for a dock / seawall permit in Palm Beach County?
Yes. Dock / Seawall Permit work in Palm Beach County normally requires a Notice of Commencement recorded with the Palm Beach County Clerk of Court before work begins. Under Florida's Construction Lien Law an NOC is required once the job value passes the statutory threshold, and inspectors can refuse the first inspection until a recorded copy is posted at the job site.
Can I pull a dock / seawall permit myself as the homeowner in Palm Beach County?
Often yes. Florida's owner-builder exemption, in section 489.103(7) of the Florida Statutes, lets an owner pull a permit for work on a home they own, subject to conditions the statute attaches, including appearing in person to sign a disclosure statement acknowledging that you take on the responsibilities of a licensed contractor. Palm Beach County can confirm what it requires at (561) 233-5100.
Get Your Dock / Seawall Permit Pulled
Palm Beach County · Experienced permit pros · No upfront cost
Need a dock / seawall permit in Palm Beach County?
Tell us about your project. We handle the rest.
Get My Permit Help — Free